Monday, 14 April 2014

Frame stage complete

Finally, the frame stage was completed on the 3rd of April. To avoid any time wasting, I organised for a frame stage inspection the next day with John the building inspector I hired and the builder. It was a fruitful event as there were a couple of errors that the inspector spotted after a thorough inspection. We are still waiting for a verdict on the report of the inspection which would come out on the 15th of April.

The Below picture was taken today. There were some carpenters working on the fixing of the frames and some windows were up on the ground floor.