Thursday, 23 January 2014

Conventional raft salb

Our soil report came back H so we could choose either the conventional raft slab or waffle pod slab. After much research, we chose the conventional raft slab over waffle pod slab because we preferred our house sitting over steel and concrete rather than polystyrene and some concrete.

Concrete base and stiffened beams laid on the 22nd of January and concrete poured on the 23rd of January.